CTCC Portadown - High demand at health centre solved by TPS..

CTCC Portadown - High demand at health centre solved by TPS.
CTCC Portadown - High demand at health centre solved by TPS.

The newly opened CTCC in Portadown is another flagship site in our extensive portfolio of hot water
generation projects.


The high peak demand for domestic hot water throughout the centre, which accomodates a minor surgery suite, 22 GP's, pharmacy, dentist and other services, required a solution that offered both ample hygenic storage as well as quick recharge rates.


Our Sile 800L AR Rapid S was the perfect solution offering 800L of storage capacity along with a high output brazed plate heatexchanger to offer rapid recovery and large peak flow demands. The standard heatexchanger on this capacity of Rapid is 120kW, but in conjunction with Sile we were able to develop the S range which utilises a 260kW exchanger. This produces 1480L in the first 10minutes or 4480l/h in continuous production at 60°C. The vessel comes completely packaged with the exchanger and charging pump mounted on the vessel along with a control stat and over temperature stat mounted on the vessel, allowing quick and simple installation. The units offer peace of mind when it comes to legionella as they are fully AISI 316 stainless steel and with the heatexchanger drawing water from the lowest point of the cylinder stratification within the tank is avoided. The Rapid is available in 230L through to 2000L capacity and with a range of heatexchanger duties available also.